Construction work continues on the Bird's Nest Olympic stadium in Beijing,
China
Photograph: Dan Chung |
|
|
 |
|
|
The National Stadium for the Beijing 2008 Olympic Games will be the main
stadium for track and field events as well as the opening and closing
ceremonies
Photograph: Dan Chung |
|
|
 |
|
|
Designed by Pritzker-winning architects Jacques Herzog and Pierre de Meuron,
the building was commissioned in 2002
|
|
|
 |
|
|
The "nest" is in fact a tightly woven lattice of steel. Photograph: AP |
|
|
 |
|
|
A view of one of the interior walkways, suspended between the exoskeleton
and the stadium's inside walls
Photograph: Iwan Baan |
|
|
 |
|
|
Two workmen take a rest on one of the 100,000 seats. After the games
are finished the stadium's capacity will be reduced to 85,000
Photograph: Iwan Baan |
|
|
 |
|
|
 
 
 
 
 |
The Beijing National Stadium, also known as the National Stadium, or
the "Bird's nest" for its architecture is a stadium that is being built
on the Olympic Green in Beijing, China for March 2008 completion.
It will host the main track and field competitions for the 2008
Summer Olympics and as well as the opening and closing ceremonies. In
2002, Government officials engaged architects worldwide in a design
competition. Pritzker Prize-winning architects Herzog & de Meuron
collaborated with ArupSport and China Architecture Design & Research
Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is
the Artistic Consultant for design.[2] The stadium will seat as many as
100,000 spectators during the Olympics, but this will be reduced to
80,000 after the games. It has replaced the original intended venue of
the Guangdong Olympic Stadium[citation needed]. The stadium is 330
metres long by 220 metres wide, and is 69.2 metres tall. The 250,000
square metre (gross floor area) stadium is to be built with 36 km of
unwrapped steel, with a combined weight of 45,000 tonnes. The stadium
will cost up to 3.5 billion yuan (~423 million USD/ ~325 million EUR).
The ground was broken in December 2003, and construction started in
March 2004, but was halted by the high construction cost in August 2004
and continued again.
Upon completion, this stadium will boast a state of the art Solar
PV system produced by Suntech Power.
|
|
|
After featuring the stunning “bubble building” being built for the 2008
Olympics in Beijing, we felt it necessary to mention an equally-awesome
structure under construction just across the way. Herzog and DeMeuron’s
Olympic Stadium, fondly referred to by some as the “Bird’s Nest,” is a
feat of engineering, an aesthetic marvel, and an uber-green machine to
boot. What we love most about the stadium’s design is its integration of
a myriad complex systems all rolled into such an aesthetically and
conceptually simple and stunning object. The Swiss architects describe
it best, saying, “The spatial effect of the stadium is novel and radical
and yet simple and of an almost archaic immediacy. Its appearance is
pure structure. Facade and structure are identical.”
The structure itself is composed of a grid-like formation that
serves as both structure and facade, integrating the stairs, walls, and
roof into one cohesive system. Instead of form being dictated by
function, Herzog and DeMeuron’s design effectively removes the
distinction, making function and form one in the same.
Such a large-scale and highly-trafficked building raises
questions of waste, efficiency, and cost, but the “Bird’s Nest” seems to
pose innovative, green solutions to a variety of potential building
issues. Its green features include a rainwater collection system, a
translucent roof that provides essential sunlight for the grass below,
and a natural, passive ventilation system.
Perhaps the most unique feature of the structure is its “cushion”
system which strategically fills the spaces within the building’s facade
to regulate wind, weather, and sunlight. On the rooftop, the inflatable
cushions fill gaps to weather- and waterproof the stadium. “Just as
birds stuff the spaces between the woven twigs of their nests with a
soft filler, the spaces in the structure of the stadium will be filled
with inflated cushions.” Coincidentally, the cushions will be made from
ETFE, the same material used to create the translucency of the “bubble
building” across the Olympic park.
Sculptural rather than an architectural sensory overload like
many a contemporary stadium, “it meets all the functional and technical
requirements of an Olympic National Stadium, but without communicating
the insistent sameness of technocratic architecture dominated by large
spans and digital screens.”